Skip to main content

ALDOT 930-725 Research Report No. 1-State-of-the-Practice: Rapid Bridge Deck Replacement Construction Techniques-Zech, Abbas, Flowers, September 2009

 File — Box: 1, Folder: 16
Identifier: 21-068

Scope and Contents

From the Collection:

This collection consists of research reports produced by the Highway Research Center.

Dates

  • Creation: September 2009

Creator

Conditions Governing Access

This collection is open for research.

Full Extent

From the Accession: 2 Cubic Feet

Language of Materials

From the Collection: English

Repository Details

Part of the Auburn University Special Collections and Archives Repository

Contact:
Auburn University
Ralph Brown Draughon Library
231 Mell Street
Auburn Alabama 36849
334-844-1732